Shenzhen factory support for commercial display projects worldwide.
info@xshlcd.comWhatsApp +86 135 2874 2522
Incoming inspection / Burn-in / Validation

Quality control that follows the display system.

Screen, enclosure, software, connections and packing all need evidence before a commercial LCD project leaves the factory.

3 checksraw-material inspection stages
72 hpowered-on and system testing
2 linesLCD production lines
5 engineersafter-sales support team
Quality path

Verify the points most likely to fail in the field.

The source company information describes triple raw-material inspection and 72-hour powered-on, vibration, software and connection-line testing.

01 / INPUT

Incoming materials

LCD panels, electronics, glass, enclosure parts and critical components require incoming checks.

02 / ASSEMBLY

System integration

Confirm display, player, touch, sensors, wiring, thermal path and service access.

03 / VALIDATION

Powered-on testing

Run display, vibration, software and connection-line testing before packing.

Outdoor LCD advertising display in a weatherproof enclosure
Certificate discipline

Publish only current, model-relevant certificates.

For the production website, each certificate should show the certificate name, issuing body, scope, covered model and validity date. Buyers should request the exact current documents for their project and market.

  • Do not use a certificate logo without the supporting document
  • Match the certificate scope to the quoted display model
  • Confirm market, plug, labels and documentation before order
  • Keep test reports and revision history with the project record
Request project documents ->
Chat on WhatsApp